Legacy AV Modernisation and LED Video Wall Upgrade Delivering 92 Percent Operational Cost Reduction
A research institution required independent AV system upgrade consultancy to modernise legacy projection systems and underperforming video conferencing infrastructure. The objective was to reduce complexity, improve performance and lower operational cost. The Challenge The institution was operating: The environment had evolved beyond its original design intent. Our AV Modernisation Strategy Operational and Technical AuditWe evaluated…
